Support for Model: PSS12H4W/A
12kw Air-Cooled Package Standby System
General Information | ||
Operators Manual | Parts List | |
Generator | ||
Generator Troubleshooting Guide | Generator Troubleshooting Table | Operators Manual |
Engine | ||
12kw Air-Cooled Package Standby System
General Information | ||
Operators Manual | Parts List | |
Generator | ||
Generator Troubleshooting Guide | Generator Troubleshooting Table | Operators Manual |
Engine | ||
Question
Curtis Cochran –
Can the generator controls be set to anything other than at 14 day intervals for the excercise? Could it be set for excercise every 30 days?
Upvote if this was helpful (0) Downvote if this was not helpful (0) Watch Unwatch Flag for removal
Dale Riebel –
Curtis, No. The ASCO 165 transfer switch is non-programmable, exercising every 14 days. You can disable the transfer switch exercise and do it manually every 30 days if you wish. See the ASCO 165 operators manual for instructions.
Upvote if this was helpful (0) Downvote if this was not helpful (0) Flag for removal